Construction Timetable

 

The indicative timetable of works for the project are shown below. The offshore work is expected to start at the beginning of 2016 with the installation of the turbine foundations. The array cables will begin to be installed midway through the year, and the turbines will be being erected at the end of 2016, into 2017.

 

Indicative Programme

 